Capacity (tpy)
20,000
Driven by increased organic diversion goals, the Fresno, California regional area needed more capacity for processing organics. In 2016, CalRecycle awarded West Coast Waste (WCW) a greenhouse gas reduction grant, providing the funds to build a large scale commercial compost facility to do just this. WCW worked with Clements Environmental and ECS to develop a proposal for an advanced aerated static pile compost system that could meet these goals and comply with the stringent requirements of the San Joaquin Valley Air Pollution Control District. Today, the facility is converting tons of green waste into a valuable soil amendment and helping the region decrease its greenhouse gas emissions by keeping organics out of the landfill.
ECS worked with the client to configure a large scale compost facility featuring a biolayer covered, positively aerated static pile (ASP) system to fit their site. The process starts with a best management practice (BMP) compliant mix of yard waste and orchard waste. The CompTroller™ control system monitors pile temperature and modulates aeration rates through the process to maintain near-optimal biological conditions. This mix and process control maintains conditions that minimize odors and maximize stabilization. The system utilizes a mass-bed configuration with six zones, each is 30 feet by 80, and has a throughput of 20,000 tons per year.
Learn more about West Coast Waste.
We want to learn more about your project goals. Call or email us to get started.
We want to learn how to support your composting goals!
4220 24th Avenue West
Seattle, Washington 98199
Tel: (206) 634-2625
Fax: (206) 634-1309