
acf
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /nas/content/live/ecs2021/wp-includes/functions.php on line 6121Capacity (TPY)
50,000
ECS focuses on providing cost effective commercial composting solutions. Waste Management wanted to develop a system to process food waste, yard waste and woody biomass to improve resource recovery.
ECS delivered a covered aerated static pile composting system to provide rapid stabilization. Delivering high aeration flow rates helps minimize odor generation, reduce required retention time, save on project equipment + installation cost, and improve overall value to the customer.
We want to learn how to support your composting goals!
4220 24th Avenue West
Seattle, Washington 98199
Tel: (206) 634-2625
Fax: (206) 634-1309