Whidbey Island Naval Station Controls Upgrade

Whidbey Island, WA 2016
Whidbey Naval composting aeration ducts
Aerial view of Whidbey Island NAS Composting Facility
ECS Engineer and CompTroller
Zone Controller
Damper Actuator
Whidbey Naval composting aeration ducts
Aerial view of Whidbey Island NAS Composting Facility
ECS Engineer and CompTroller
Zone Controller
Damper Actuator

Capacity (tpy)

1,000

Client Needs

Naval Air Station (NAS) Whidbey Island installed a competitor’s (non-ECS) in-vessel composting system in the 1990s. Technical support had been an issue for some time, and in 2015 the vintage custom control system stopped working. The compost facility needed a company that would provide:

  • A replacement automated aeration control and monitoring system to manage their existing 8 vessel system
  • New variable frequency drives (VFDs), sensors, motorized dampers and other components
  • Reliable service and ongoing technical support to assist with operations

ECS Solution

This project was a perfect application for the CompTroller™ 3.0. Our off-the-shelf technology got them up and running quickly, and we provided a whole suite of improved control and monitoring features.

The entire upgrade which included installing panels, re-landing field wires, installing new pressure sensors, testing equipment and providing specific training on the new CompTroller™ software and a review of composting procedures with operators and manager took three days onsite.